- Load
- 5.2-metre pipework section, about 400kg
- Vehicle
- 18-tonne curtainsider, tail lift
- Route
- Rotherham to Immingham
- Distance
- 62 miles
The problem
A pressure line failed on a live site late in the morning and the plant it fed had to be shut down. The fabricator had a replacement section finished by early afternoon, but their own vehicles were out and the pallet network they normally use could not collect until the following day. Every hour the site stayed down was costing the end customer money.
What happened
Collected at half past two and delivered to site the same afternoon. The curtain side meant the cradle could be lifted straight off from the side rather than dragged the length of a box body, and the tail lift dealt with the fact there was no forklift on site. The line was back in service that evening.